A variety of food service equipment incentives are available to Idaho business customers.
Measure | Incentive |
---|---|
Auto-closers | $55 to $400 per door |
Anti-sweat heat controls | $50 per linear ft. |
ECM motor on compressor head | $100 per motor |
Floating head pressure | $160 per hp |
Floating suction pressure | $40 per hp |
Automatic high-speed door | $25 to $100 per ft2 of door opening |
Strip curtain | $5 per ft2 of door opening |
No-heat glass door | $200 per door |
Evaporative pre-cooler added to air-cooled condenser | $30 per ton |
Defrost coil control | $50 per unit |
ENERGY STAR electric oven (combination or convection) | $180 to $800 per unit |
ENERGY STAR electric fryer | $150 per unit |
ENERGY STAR electric steamer | $30 per pan |
ENERGY STAR commercial ice machine | $100 or $300 per unit |
ENERGY STAR hot food holding cabinet | $200 to $800 per unit |
On-demand overwrapper | $100 per unit |
VFD on kitchen exhaust or makeup air fan | $250 per hp |
- Non-Lighting Application (Updated Sept. 5, 2023)
- Food Service Equipment Incentives and Worksheet (Updated Sept. 5, 2023)
If your project doesn’t fall within our menu of incentives, we may be able to offer an incentive of 18 cents per kilowatt hour saved, up to 70% of the eligible project cost for other qualifying custom projects.
Pre-Approval Application Process
Pre-approval is needed for projects with estimated incentives of $2,000 or greater. Obtain pre-approval from Idaho Power before the project begins.
- Download the applicable worksheet from the Application and Worksheets section and enter your project’s information.
- Download, fill out, sign and date the Non-Lighting Application.
- Gather manufacturer specification sheets for equipment to be installed.
- Email the above items to retrofit@malutang.com.
- Idaho Power reviews the submitted paperwork and sends written pre-approval via email.
Payment Application Process
Submit a Non-Lighting Application within 90 days of project completion.
- If your project was not pre-approved, download the applicable worksheet from the Application and Worksheets section and enter your project’s information. If your project was pre-approved, use the same worksheet you submitted at pre-approval (edit as necessary to reflect actual project).
- If your project was not pre-approved, download, fill out, sign and date the Non-Lighting Application. If your project was pre-approved, use the application submitted for pre-approval and mark “Payment” in the box at the top of the page.
- Gather detailed labor and material invoices.
- For projects that did not require pre-approval, submit the manufacturer specification sheets for the installed equipment.
- Email the above items to retrofit@malutang.com.
- Idaho Power reviews the submitted paperwork and processes the incentive payment.
NOTE: Idaho Power reserves the right to perform a site inspection. You or your contractor will be notified if your project is selected for inspection.
Questions? Contact us at retrofit@malutang.com.
Project requirements apply. Please reference specifications section on worksheet. Additional criteria is available in the Policies and Procedures Manual.
Note: Program continuation, eligibility requirements and terms and conditions apply.
For assistance with a PDF on this page or to request a PDF in an alternate format, please contact Customer Service at 208-388-2323 or 1-800-488-6151